Maidstone bridges bedding in problems with drivers going the wrong way down the new road
13:25, 01 December 2016
A stretch of road that only opened this morning is already having a few bedding in problems.
The Maidstone bridges scheme, which has been running since the start of June, finished this morning.
The two new northbound lanes on the A229 Fairmeadow are now open, allowing drivers to bypass the bridge system.
VIDEO: It seems the new bridge works have caused confusion already.
But this has already been causing a few issues, with drivers ignoring road markings and signs.
Drivers travelling north on Bishops Way towards the gyratory need to be in the left or middle lanes if heading over the bridges, and in the middle or right lanes if using the new road.
However, some drivers that were so used to the old system were still turning left over the bridges from the right-hand lane, cutting up other road users wanting to go straight on in the middle lane.
And the problems didn't stop there, with cars turning right off St Peter's Bridge heading down the new lanes, the wrong way into oncoming traffic.
Workers from KCC and Jacksons Engineering were thankfully on-site to stop the cars getting into a serious accident.
The workmen will remain at the bridges for the course of the day to help monitor traffic, but they're hoping drivers begin to get used to the new layout, and pay attention to signage and road markings.
Latest news
Features
Most popular
- 1
Boy, 16, found safe after going missing nine days ago
- 2
‘This rat-run bridge isn’t wide enough - someone will be killed soon’
- 3
Only shop in village to shut this week as ‘devastated’ couple leave Kent
17 - 4
A-road shut in both directions after water main bursts
- 5
Mum joined teen son in smashing up ex’s family home and car